中国帅气体育生GARY网站,亚洲AV无码乱码在线观看性色,粉丝:马上去试!_天晴书院
<menuitem id="b51bz"><strike id="b51bz"><nobr id="b51bz"></nobr></strike></menuitem>

    <track id="b51bz"><del id="b51bz"></del></track>

    <pre id="b51bz"><del id="b51bz"><dfn id="b51bz"></dfn></del></pre> <p id="b51bz"></p>

      <pre id="b51bz"><del id="b51bz"></del></pre>
      <p id="b51bz"><pre id="b51bz"><mark id="b51bz"></mark></pre></p>

        <pre id="b51bz"><del id="b51bz"></del></pre>

          Welcome to SEPCOIII ! Set home

          National Energy Urumqi Guaranteed Grid-connected 100MW Wind Power Project from 2021-2022 the hoisting of the first fan is successful

          2023-3-15 14:11:50

          At 2:4 a.m. on March 11, the hoisting of the first wind turbine of Urumqi 2021~2022 Guaranteed Grid Connection 100MW Wind Power Project was successfully completed.

          The project is planned to install 16 fan units with a unit capacity of 6.25MW, with a total installed capacity of 100MW. After the completion of the project, it will break the outstanding problems of scattered distribution of existing wind farms, multiple lines of repeated construction, complex management models, low land utilization rate, high unit cost and operating costs, and has great significance in promoting the transformation of local regional energy and resource advantages into economic advantages, promoting the clean and low-carbon transformation of energy and electricity, and driving local economic and social development. During the construction process, the Project Department planned ahead, organized reasonably, actively overcame various difficulties, scientifically formulated the construction plan, and orderly promoted the site construction to ensure the successful completion of the first fan hoisting.


          中国帅气体育生GARY网站,亚洲AV无码乱码在线观看性色,粉丝:马上去试!_天晴书院